PTC, Part 4: Interoperability
A locomotive belongs to its owner, but the PTC system belongs to the track. Making 209 host and tenant pairs work meant dual-equipped waysides, a shared messaging network, a common onboard program, a 220 MHz band carved up between two incompatible systems, and a change control board for every software release. How it works, where it broke, and what is still not public.
Part 4 of Positive Train Control in the United States. Parts 1, 2 and 3 covered the five systems one at a time.
The first three parts treated each PTC system as if it ran alone. Almost none of them do. Amtrak runs on freight railroads, freight railroads run on Amtrak and on commuter lines, commuter trains run on each other, and Class I railroads run on each other everywhere. A locomotive belongs to its owner, but the PTC system belongs to the track, and the train has to obey whichever system governs the track it is on.
That is the interoperability problem, and it shaped PTC as much as any single system did.
What the law requires
The statute defines interoperability as "the ability to control locomotives of the host railroad and tenant railroad to communicate with and respond to the positive train control system, including uninterrupted movements over property boundaries."1 FRA's rule narrows it to "the ability of a controlling locomotive to communicate with and respond to the PTC railroad's positive train control system."2 The difference is small but real: the rule cares about the locomotive in control of the train, and it makes the host's system the one that counts.
The operative requirement is 236.1006(a): each train on PTC track "shall be controlled by a locomotive equipped with an onboard PTC apparatus that is fully operative and functioning in accordance with the applicable PTCSP approved under this subpart."3 The applicable safety plan is the host's. A tenant does not bring its own PTC onto someone else's railroad. It has to work under theirs.
FRA's 2018 guidance spelled out the duties. Each tenant must "reasonably provide its host railroad with the necessary and relevant information and assistance the host railroad requires to ensure interoperability." Each host must consult its tenants, summarize what they need to do in its safety plan, and assure FRA that interoperability has been achieved. And the enforcement mechanism is blunt: a certified host "shall not allow the tenant railroad to operate on its track" with equipment that is not interoperable, unless an exception applies.4
How many pairs
In 2019, GAO reported FRA's count of 227 host and tenant relationships that needed interoperability. As of March 31, 2019, 38 of them were complete.5 Class I hosts had an average of about 18 tenants each; commuter hosts about three.5 FRA estimated 219 relationships as of September 2020, and reported 209 achieved as of December 2020.67 I have not found a later FRA count. The number of host railroads has grown from 35 to 37.78
Two ways to cross a boundary
There are two ways to let a train equipped for one system run on track governed by another. The industry's radio study for the Northeast Corridor put them plainly: "Dual-equip the tracks" or "Dual-equip the locomotives."9
On the Northeast Corridor, the railroads mostly chose the first. Where Norfolk Southern runs on Amtrak between Philadelphia and Harrisburg and between Philadelphia and Washington, Amtrak installed I-ETMS beside ACSES: "ACSES and I-ETMS WIUs installed at each interlocking will function as encoders for ACSES and I-ETMS equipped trains." The dispatching system sends each temporary restriction "to the I-ETMS BOS and to the ACSES Safety Server in separate messages," and each onboard enforces it independently.10 NJ Transit did the same for its freight tenants, Norfolk Southern and the New York, Susquehanna & Western: I-ETMS "will be installed in parallel with the ASES II installation. Each system will be independent of the other with separate WIUs, Back Office Servers, and Communications networks."11 SEPTA mostly took the other route: CSX, and NS on the Airport Line, run equipment compatible with ACSES on SEPTA track, and SEPTA provides a "dual wayside message structure through the WEU" only at the boundary between its ACSES II territory and I-ETMS territory.12 And on Amtrak's Michigan line east of Kalamazoo, ITCS and I-ETMS run side by side, with integrated wayside units that "provide information to both systems."13
MARC shows how the choice plays out on one railroad. Its electric locomotives carry ACSES and the rest of its fleet carries I-ETMS. Because Amtrak supports both on the wayside where MARC runs, "MARC will use the respective wayside system for the lead unit of each train."10
Dual-equipped wayside is expensive, because every interlocking gets two systems. Dual-equipped locomotives cost less on the ground and more on the train, and they move the problem to the moment the train crosses from one system to the other. By early 2019 Amtrak had type-tested ACSES with six of its eleven ACSES tenants (ConnDOT, Conrail, CSX, MBTA, P&W and SEPTA).14 Two of those, CSX and Conrail, are also I-ETMS host railroads,15 so their fleets have to work under both systems.
At the boundary
Between two I-ETMS railroads there is, by design, no boundary at all. At initialization, the crew selects every railroad the train will run on, and the onboard pulls each railroad's track data before departure: "all data needed to cross a railroad boundary is thus onboard and current before the train actually reaches the boundary and no special 'hand-off' processing is required at that time." The onboard "will prevent entry into any subdivision or district PTC track segment in the known route of the train that data was not received for during initialization or updated en route."16
Entering I-ETMS territory from track governed by something else is enforced: "The Locomotive Segment enforces entry by a train into I-ETMS controlled territory from territory not controlled by I-ETMS." Leaving it is not, apart from any signal, cab signal, track warrant limit or speed restriction at the exit location. The onboard warns as the train approaches an exit point, and "upon leaving I-ETMS controlled territory, the Locomotive Segment automatically downgrades its operating mode and no longer enforces train or engine movement, except in approach to I-ETMS territory."16
ACSES puts the burden on the crew. Amtrak's operating instruction says "ACSES must be cut in before entering ACSES territory," and once the departure test is done, "ACSES system must remain cut in."17 At an "End ACSES" transponder set the onboard drops into an "Out of ACSES" territory mode, though it still enforces a line speed cap based on the last line speed it received.18
The one changeover the public record describes in detail is at CP45, near Worcester, where CSX and Amtrak trains move between CSX's I-ETMS and the MBTA's ACSES. "CSX and Amtrak trains will be dual-equipped with radios from both systems." Westbound, "in order to transition to ITC control, CSX and Amtrak trains need to start communicating with the ITC WIU at CP45 5 miles ahead of that location, meaning that these trains will have their radios active for both systems."9 Two radios on one locomotive, a few feet apart, talking to two networks at once, is a radio interference problem. The same study predicted that the MBTA's ACSES site at CP43 would desensitize the I-ETMS radios of trains near it, and vice versa.9
On the Michigan line the vendor built the cut-in from unequipped track at the east end into the data. Westbound trains "cut into PTC enforcement at the Virtual Signals," a set of signals that exist "in the ITCS database only and not part of CAD database," so the train does not have to slow or stop for the cut-in. The design document names its own failure case: if signals are lined on both main tracks at CP Townline, "the field logic cannot determine which track to occupy ... any/both ITCS trains would unlocate due to an unknown track number. This scenario should be extremely rare."19
What a dual-equipped train does when its second system fails to come up at the boundary is not in any public document I have found. FRA made Amtrak analyze it. Its December 2020 certification of Amtrak's I-ETMS required a human factors analysis of "an engineer's interactions with the onboard system when the PTC system transitions from I-ETMS to ACSES II (or vice versa)," including how each system "would take any necessary enforcement action in the event the engineer fails to take appropriate action when the system is transitioning."20 Amtrak delivered it, and FRA closed the item in June 2021.21 The analysis itself is not in the public docket.
The freight machinery
On the freight side, interoperability was solved mostly by agreeing to be identical. Part 1 described the 2008 agreement that put every Class I railroad on one onboard program. The rest of the machinery is less visible.
Standards. The Association of American Railroads publishes the interoperable train control (ITC) standards in Section K of its Manual of Standards and Recommended Practices, a subscription document.22 The public index lists the titles: an ITC system reference architecture (S-9001), wayside interface unit requirements (S-9202), onboard PTC application requirements (S-9051), the office-to-locomotive and wayside-to-locomotive interface control documents (S-9361, S-9362), Class C and Class D messaging (S-9355, S-9356), the Edge Message Protocol (S-9354), a PTC data model and track data file format (S-9501, S-9503), a federated network specification (S-9074), and a second-generation PTC security architecture (S-9008) with its own key management service (S-9420).23 The contents are not public.
Messaging. The messaging layer, ITCM, carries everything between back offices, waysides and locomotives. FRA's 2023 cybersecurity study describes it: "ITCM is based on Red Hat Enterprise Linux Messaging Real-time Grid (MRG), MRG messaging brokers, and a few custom components. The messaging functionality is based on Qpid, an Apache open-source implementation of the Advanced Message Queuing Protocol (AMQP)." Applications send Edge Message Protocol messages, and link managers move them over 220 MHz radio, cellular, Wi-Fi or wired IP.24 Wayside status messages are most of the traffic, "at least one message per WIU every 4 seconds" while beaconing.24
Federation. Each railroad's back office must be linked to the others so a foreign train can get authorities, bulletins and track data. Railroads call that "federation," and for I-ETMS it had to be finished before lab or field testing could start.5 It also hit a limit nobody had planned for. In the Chicago area, where ten I-ETMS railroads received extensions, a locomotive "needs to store and exchange multiple railroads' track data, causing the memory to fill up very quickly." An interim vendor fix in March 2019 "allowed the four largest Class I railroads to achieve interoperability," seven months late.5
Change control. If every host must run the same onboard software, nobody can change it alone. FRA's 2021 rule lets hosts using the same system and classification file joint requests for amendment,25 and the I-ETMS hosts do: the 2025 release, onboard 6.5.5.0, was one filing for 21 railroads.26 Behind each filing is an industry process the filings describe: onboard software is an "Interoperable Configuration Item," and changes require "documenting the change in the Interoperable Lifecycle Management (ILM) tool and gaining approvals through the Interoperable Change Approval Board (ICAB)."27 Railinc, the AAR's data subsidiary, runs that tool, along with a train sheet application for railroads without electronic data interchange and a service for requesting diagnostic data from another railroad's PTC assets.28
ACSES has no equivalent. FRA noted in 2021 that "there is not a uniform standard or specification currently underlying the ACSES II or ASES II PTC systems," and the ACSES railroads were writing an "Interoperable Change Management Plan."7
Radio
Both big systems use the same radio band, and that caused its own interoperability problem.
The freight network. The Class I railroads formed PTC-220 LLC to hold spectrum in the 220 MHz band; by 2023 it held 31 geographic licenses plus leases, and had more than 50 active spectrum leases to commuter and other railroads.29 The radios are Meteorcomm's: wayside, locomotive and base station units in the 217.6 to 222 MHz range, on 25 kHz channels at 16 or 32 kbps, with 25, 50 and 75 watt peak outputs.30 FRA's 2020 roadmap counted "14 nationwide PTC channels (25 kHz each) and an additional 8 channels used in the Chicago DUA," and, modeling all railroad-owned spectrum in Chicago (220 MHz PTC plus the 450 MHz, 900 MHz and remote control bands), warned that "the currently available spectrum will be exceeded within 5 years."31 The FCC waived its usual limits to let PTC base stations in the 221 to 222 MHz segment run up to 500 watts at up to 150 meters (about 490 feet) above average terrain.32
The commuter problem. Commuter railroads had to find spectrum on the secondary market and had trouble doing it in dense urban areas.33 The Northeast Corridor added a second problem: ACSES radios "are designed to operate in the 216-222 MHz frequency range," the same band as I-ETMS, and close-in freight and commuter radios "can experience intersystem interference."34 The engineering answer, which FCC orders cite, was to separate them by frequency: "I-ETMS radios should only operate above 220 MHz and ACSES radios below 219 MHz when in close geographic proximity."35 NJ Transit leases 218 to 219 MHz spectrum from the MTA, and SEPTA, which had started on a 220 to 222 MHz license, prepared to move to 218 to 219 MHz.34
Running out. The freight network was designed with a single nationwide common channel for every locomotive radio, and in busy areas that channel congested, "resulting in many communications from the PTC base station not getting through." The fix, a Robust Common Channel, "requires two additional channels designated as common channels."36 To get them, PTC-220 bought spectrum in the adjacent 219.5 to 220 MHz maritime (AMTS) band, and in 2024 the FCC gave it permanent authority for 76 base and 144 wayside stations in 53 counties of New Jersey, New York and Pennsylvania, citing "the need for its members to deploy two additional PTC common channels."37 In 2023 the FCC also let PTC-220 spectrum carry other rail safety systems (end-of-train devices, distributed power, detectors, crossing systems), on condition that PTC-220 "afford PTC the highest priority on its 220 MHz Band spectrum."29
Poles. A radio network needs antennas. In May 2014 the FCC reached agreements with the seven Class I railroads over "construction prior to May 31, 2013, of positive train control (PTC) facilities that may not have undergone the statutorily required environmental and historic preservation review," letting them use "nearly 11,000 previously-constructed poles" and setting up a ten million dollar Cultural Resource Fund for tribes and state historic preservation offices.38 A program comment adopted the same month streamlined review for wayside poles no taller than 75 feet in the railroad right of way. The background figures in it: about 30,000 wayside poles nationwide, one to three miles apart, mostly 25 to 65 feet tall. It has since been extended to May 16, 2036.3940
Where it broke
The boundary problems in the public record are worth listing, because they show where interoperability is hard.
- Temporary restrictions across a line. At the end of 2020, the link between Amtrak's and NJ Transit's restriction servers was not ready. FRA approved interim boundary zones at five locations, each "two TSR zones (different radio frequencies), plus an overlap of a safe braking distance into a third TSR zone," with "TSR Limit" signs and a one-mile boundary restriction at the slowest speed in the zone, on condition that the server link be in place by December 31, 2021.41 Amtrak's 2025 filing for its new restriction servers still describes the NJ Transit connection as "planned."42 The same release notes record a fixed defect: Amtrak's server was "unable to set TSRs near the boundary with MNR."42
- Back-to-back signals. At Harold Interlocking, where Amtrak and the LIRR meet, "two consecutive facing signals with no intermediate Distant Signal transponder set" required an interim mitigation from October 2020 and a software fix that slipped to November 2022.4344
- A host outage takes its tenants down. In August 2023, Norfolk Southern filed an emergency request after "a system-wide outage of its PTC back office, temporarily impacting the operations of NS and its tenant railroads," then withdrew it two days later.45 FRA's 2024 proposed rule on PTC outages is aimed at exactly this case: failures "impacting the trains of the host railroad and often most, if not all, of its tenant railroads."8
- The joint process says no. In October 2021, FRA disapproved a joint I-ETMS amendment from 19 railroads "to enhance operational effectiveness," and the railroads were "prohibited from making the proposed changes" until they resubmitted.46 When every host runs the same software, one rejected change stops all of them.
I have found no NTSB report attributing an accident to a host and tenant PTC boundary.
Security
The PTC rule's security requirement is narrow. 49 CFR 236.1033 requires that "all wireless communications between the office, wayside, and onboard components in a PTC system shall provide cryptographic message integrity and authentication," with keys that use an algorithm approved by NIST or another FRA-approved standards body. Encryption for confidentiality is optional.47 (GAO's 2019 statement that FRA requires PTC communications "be encrypted" overstates the rule.5)
The I-ETMS design signs safety-critical messages with keyed hashes, but FRA's 2023 study found a weakness in how wayside keys are shared. Because the wayside key must be shared "with every locomotive which may require status from that wayside," the study said "[t]his broad sharing of long-lived Wayside OPKs represents a risk to PTC security."24 The industry's second-generation security architecture and key management standards appeared in 2024 and 2025.23
Since May 2024, a second regulator has had a say. TSA's rail cybersecurity directive requires railroads that operate PTC to "include PTC systems as a Critical Cyber System," and its companion directive requires cyber incidents to be reported to CISA within 72 hours.4849 TSA's directive borrows FRA's definition of PTC and cites FRA's part 236, but neither directive mentions FRA's PTC security rule, and FRA's rule does not mention TSA.
On February 12, 2026, FRA wrote to all 26 I-ETMS host railroads. The letter's entire account of what prompted it is one sentence: "In light of a November 2025 malicious data breach, FRA recently reviewed several host railroads' I-ETMS PTC Safety Plans (PTCSPs) to identify and evaluate the railroad-specific security tools in place today to prevent against security threats and intrusions." FRA found that "multiple railroads' PTCSPs do not contain the level of detail contemplated by Section 9 of the I-ETMS PTCDP," and required each host to review that section and its own safety plan "to ensure its PTCSP includes the required information and robustly protects the security of I-ETMS."15 The letter does not say who was breached, what data was taken, or whether a PTC system was affected. It sets no deadline. I have found no other public source on the breach, and I am not going to guess.
What comes next
The capacity problem is the one the industry is working on most visibly. Meteorcomm's newer locomotive radio receives 20 channels at once and supports channels up to 100 kHz wide.50 The AAR's research arm has presented IEEE 802.16t as a potential solution for railroad spectrum at 160 and 900 MHz,51 though nothing I have read ties it to PTC. FRA's 2021 PTC summary pointed to "Next Generation PTC or PTC 2.0," alongside work on high-precision train location, full moving block and automated train operation.52 None of that changes the basic arrangement: a host's PTC system governs its track, and every tenant has to speak its language.
The series
Five systems, one law. The freight railroads built one system and agreed to be identical. The Northeast Corridor built on cab signals it already trusted. Five small commuter railroads put PTC into the cab code. Amtrak's Michigan line kept a system it had built before there was a rule. PATH rebuilt its signals and did not fit FRA's categories. And where any two of them meet, someone had to install both, or teach a locomotive to speak two languages, and decide what happens in between.
Notes
Footnotes
-
49 U.S.C. 20157(i)(3). govinfo.gov ↩
-
FRA letter to AAR, APTA and ASLRRA, "Revised Positive Train Control Guidance Regarding Interoperability Testing, Operations and Maintenance Manuals, and Certification Responsibilities," July 24, 2018. railroads.dot.gov ↩
-
Government Accountability Office, GAO-19-693T, July 31, 2019. gao.gov ↩ ↩2 ↩3 ↩4 ↩5
-
Federal Railroad Administration, "Positive Train Control Systems," notice of proposed rulemaking, 85 FR 82400, December 18, 2020. govinfo.gov ↩
-
Federal Railroad Administration, "Positive Train Control Systems," final rule, 86 FR 40154, July 27, 2021. govinfo.gov ↩ ↩2 ↩3
-
Federal Railroad Administration, "Positive Train Control Systems," notice of proposed rulemaking, 89 FR 85462, October 28, 2024. federalregister.gov ↩ ↩2
-
Transportation Technology Center, Inc., "Northeast Corridor PTC Radio Frequency Network Design," DOT/FRA/ORD-18/08, April 2018, sections 1.1, 2.1 and 5.7.6. railroads.dot.gov ↩ ↩2 ↩3
-
Amtrak, request for amendment of September 23, 2024, enclosing PTC Implementation Plan Revision 12.0 (September 2024), sections 3.3.2, 4.3 and 5.1.1. regulations.gov, FRA-2010-0029-0243; MARC and NS descriptions also in Revision 11.0, June 2024 regulations.gov, FRA-2010-0029-0230. ↩ ↩2
-
NJ Transit, PTC Implementation Plan, Version 10.1, December 3, 2020, sections 3.1.2 and 3.3.2. regulations.gov, FRA-2010-0033-0088 ↩
-
SEPTA, PTC Implementation Plan, Revision 3, January 11, 2016, sections 5.1.2 and 5.2.1. regulations.gov, FRA-2010-0036-0064 ↩
-
Michigan Department of Transportation, PTC Implementation Plan, Revision 1.1, September 28, 2016, section 3.1. regulations.gov, FRA-2010-0029-0077 ↩
-
Amtrak, 2018 Annual PTC Progress Report (Form FRA F 6180.166). regulations.gov, FRA-2010-0029-0119 ↩
-
FRA letter to I-ETMS host railroads, "Security of the Interoperable Electronic Train Management System," February 12, 2026. regulations.gov, FRA-2010-0049-0108 ↩ ↩2
-
Union Pacific, Norfolk Southern, CSX and Wabtec, I-ETMS PTC Development Plan, Version 3.1, July 8, 2015, the current version, sections 5.3 (pp. 5-18 to 5-19), 5.6.5.7 and 5.6.5.8 regulations.gov, FRA-2010-0061-0098. The same sections are in Version 2.0, June 1, 2011, where the entry sentence ends "that has not been initialized" FRA-2010-0072-0015. ↩ ↩2
-
Amtrak, AMT-3 section 7.4, ACSES instructions (March 2, 2015), filed as Appendix L.2 to Amtrak's ACSES PTC Safety Plan, Revision 4 (September 2016). regulations.gov, FRA-2010-0029-0070 ↩
-
MBTA, PTC Development Plan, May 2011, section 8.6.2. regulations.gov, FRA-2010-0030-0044 ↩
-
Alstom, ITCS Concept of Operations 083425-108, Revision A01, July 9, 2018, section 5.5, attached to Amtrak's ITCS request for amendment of January 25, 2019. regulations.gov, FRA-2010-0029-0115 ↩
-
FRA conditional certification of Amtrak's I-ETMS as a mixed system, December 14, 2020, Enclosure 2. regulations.gov, FRA-2010-0029-0141 ↩
-
FRA approval of Amtrak I-ETMS PTC Safety Plan Revision 2.0, June 21, 2021. regulations.gov, FRA-2010-0029-0159 ↩
-
Association of American Railroads, Manual of Standards and Recommended Practices, Section K. aarpublications.com ↩
-
Association of American Railroads, Manual of Standards and Recommended Practices, Section A-I, Tables of Content, September 2026. aar.com ↩ ↩2
-
Meteorcomm for FRA, "PTC Communications: Cybersecurity Technology Review and Concept of Operations," DOT/FRA/ORD-23/39, December 2023. railroads.dot.gov ↩ ↩2 ↩3
-
Railroads' joint request to amend their PTC Safety Plans, onboard software 6.5.5.0, 90 FR 36279, August 1, 2025. federalregister.gov ↩
-
Joint I-ETMS request for amendment, Revision 1.8, July 16, 2021, section 4. regulations.gov, FRA-2010-0029-0160 ↩
-
Railinc, Positive Train Control products. railinc.com; PTC ILM Change Management User Guide, February 2025 railinc.com; About Railinc railinc.com. ↩
-
Federal Communications Commission, Memorandum Opinion and Order, DA 23-564, June 29, 2023. fcc.gov ↩ ↩2
-
Meteorcomm, "ITCR 1.0 Functional Product Specification," December 10, 2012 railroads.dot.gov, and "ITC 220 MHz Radio Hardware Specifications" railroads.dot.gov. ↩
-
Transportation Technology Center, Inc., "Railroad Wireless Communications Roadmap," DOT/FRA/ORD-20/10, March 2020. railroads.dot.gov ↩
-
Federal Communications Commission, Memorandum Opinion and Order, DA 15-332, March 13, 2015. fcc.gov ↩
-
Government Accountability Office, GAO-13-720, August 2013. gao.gov ↩
-
Federal Communications Commission, Order of Modification, DA 17-234, March 9, 2017. fcc.gov ↩ ↩2
-
Federal Communications Commission, Order of Modification (Metropolitan Transportation Authority, Station KIVD0002), DA 16-906, August 10, 2016. fcc.gov ↩
-
Federal Communications Commission, Order, DA 23-928, October 3, 2023, para. 5 (summarizing PTC-220's filing). fcc.gov ↩
-
Federal Communications Commission, Order, DA 24-822, August 27, 2024. fcc.gov ↩
-
Federal Communications Commission, news release on PTC pole agreements with the Class I railroads, May 19, 2014. fcc.gov ↩
-
Advisory Council on Historic Preservation, Program Comment for Positive Train Control wayside facilities, May 2014. achp.gov ↩
-
Advisory Council on Historic Preservation, PTC Program Comment extensions. achp.gov ↩
-
FRA approval of Amtrak, NJ Transit and Conrail "STS to STS TSR Mitigation at Line Boundaries," December 14, 2020. regulations.gov, FRA-2010-0029-0140 ↩
-
Amtrak request for amendment, Revision 7.0 (Hitachi Safety TSR Server), May 2025, section 3.1.1 and release notes Table 4. regulations.gov, FRA-2010-0029-0248 ↩ ↩2
-
FRA approval of Amtrak and LIRR Harold Interlocking back-to-back mitigation, October 6, 2020. regulations.gov, FRA-2010-0029-0137 ↩
-
FRA approval of the Harold Interlocking mitigation extension, March 8, 2022. regulations.gov, FRA-2010-0029-0173 ↩
-
"Norfolk Southern Railway's Request To Operate During a Temporary Outage of Its Positive Train Control System," 88 FR 60531, September 1, 2023 federalregister.gov; withdrawal, 88 FR 61005, September 6, 2023 federalregister.gov. ↩
-
FRA disapproval without prejudice of the joint I-ETMS request for amendment of September 10, 2021, October 25, 2021. regulations.gov, FRA-2010-0029-0169 ↩
-
Transportation Security Administration, Security Directive 1580/82-2022-01E, "Rail Cybersecurity Mitigation Actions and Testing," effective May 3, 2026, section III.A.2. tsa.gov The PTC requirement first appeared in the May 2024 revision; see TSA, "Enhancing Surface Cyber Risk Management," 89 FR 88488, November 7, 2024 federalregister.gov. ↩
-
Transportation Security Administration, Security Directive 1580-21-01E, "Enhancing Rail Cybersecurity," effective January 16, 2026. tsa.gov ↩
-
Meteorcomm, next-generation locomotive radio brochure. meteorcomm.com ↩
-
AAR and MxV Rail, 28th Annual AAR Research Review, September 6, 2023, wireless session. mxvrail.com ↩
-
Federal Railroad Administration, PTC flyer, November 2021. railroads.dot.gov ↩