PTC, Part 3: E-ATC, ITCS and PATH

Three of the five PTC systems in the United States serve seven railroads between them. E-ATC sends PTC data through the coded cab signal. ITCS, a GPS and radio system first used in 2000, still runs Amtrak's Michigan line at 110 mph. PATH replaced its signals with CBTC and found that FRA's categories did not fit. How each works, and what each shows about the rule.

Justin Morrison23 min read

Part 3 of Positive Train Control in the United States. Part 1 covered I-ETMS and Part 2 covered ACSES II.

Most route miles of PTC in the United States run on two systems. The other three serve seven railroads between them: five commuter lines on E-ATC, Amtrak's Michigan line on ITCS, and PATH between New Jersey and Manhattan on CBTC.1 They are worth a part of their own for two reasons. Two of them come from the same Harmon, GE and Alstom equipment line covered in the Harmon history and the UCII post, and they show how far a cab signal platform can be pushed. And all three tested FRA's classification rules in ways the big systems did not.

E-ATC: PTC through the cab code

The idea

Part 2 showed how ACSES adds civil speed and positive stop to a cab signal system with transponders and radio. E-ATC, Enhanced Automatic Train Control, does it without either. It sends everything through the coded track circuit.

The E-ATC Type Approval describes a system that enforces the four PTC functions "while retaining existing field signal system and CAD system functions as the primary means of maintaining train separation and protection."2 The wayside is ordinary for a cab signal railroad: "Coded track circuits implemented between CPs provide train detection as well as convey aspect information between locations. DC track circuits provide train and broken rail detection within CP limits," with 100 Hz cab signal overlays where DC circuits are used.2 (WES and UTA use a 100 Hz carrier; DCTA and Capital Metro use 40 Hz.34)

The difference is what the code is allowed to mean. A cab code ordinarily carries the signal aspect. Under E-ATC it carries the speed the train may run, and that speed can be lowered for reasons that have nothing to do with the block ahead.

  • Civil speed. "Any civil speed restriction different from available code rates will be enforced by selecting the next lower speed code. Each signal at CPs and cut sections are programmed to reflect the Maximum Authorized Speed for that location."2 On UTA's FrontRunner, for example, whose codes step from 59 to 45 mph, a curve good for 50 mph is enforced at 45.5
  • Temporary restrictions. The dispatcher sends the restriction to the wayside, which "communicates the TSR to the Onboard Segment via the corresponding cab signal code rate." The restriction "will stay latched in the wayside equipment until released by the Dispatcher," and "two actions shall be required by the Dispatcher to apply or release any TSR."2
  • Positive stop. Work zones and malfunctioning crossings are protected by a zero-speed restriction: "Prior to the train entering the work zone, a Positive Stop will be enforced by the OBC due to this zero speed TSR."2 Once the train has stopped and the roadway worker or flagger is ready, the dispatcher releases that one train at restricted speed: by a Speed Restriction Override at WES and Capital Metro, a train release at DCTA, and an expedient release added by amendment in 2023 at UTA.637

The code rate table is set per railroad. The 2013 Type Approval describes "one of 14 code rates that vary from 312.5 PPM to 74.3 PPM" on a 100 Hz carrier.2 WES's 2017 safety plan lists 15 rates between 64.5 and 306.4 pulses per minute.8 The extra rate is a 10/10 code (64.51 PPM) that WES added for PTC to carry 10 mph restrictions.6 Capital Metro's 40 Hz table has 21 rates (in 2025 it swapped its 60/40 and 40/40 rates for 20/EOB and 15/EOB), and UTA's 100 Hz table only six, from 50 to 420 PPM.495

Why it is economical

Look at what E-ATC does not need. There is no transponder in the track, no GPS, no track database on the train, no radio in the safety path to the train, and no back office server sending authorities. (UTA and SMART added a data radio by amendment in 2020, but only so the dispatcher can authorize No Code Proceed.)510 The train already reads the rails continuously. E-ATC changes what the wayside puts into them.

That makes the wayside the heart of the system. FRA's text calls both the transmission of a restriction to the wayside signals and the generation of the code rates "vital."2 The office still needs a link to every control point and cut section to send restrictions, and the Type Approval requires "redundant and diverse paths between the wayside and office segments."2 But the link only has to carry restriction requests and indications. The safety decision is made at the wayside, which is already a vital signal location, and enforced by an onboard unit that is already a vital cab signal unit.

It also explains who uses E-ATC. All five hosts are commuter railroads with coded track circuits and Alstom vital logic, where a cab signal already existed or could be added: Portland & Western with TriMet's WES line (15 miles), Denton County's A-train (21 miles, where the 40 Hz cab signal came with E-ATC), Capital Metro's Red Line in Austin, UTA's FrontRunner (83 miles), and SMART in Sonoma and Marin counties.113

The onboard

The onboard is the UltraCab II: "Each train is equipped with GETS' Ultra Cab II (UCII)." (UTA also runs Alstom's MicroCabmatic IIIG on part of its fleet, and the UCII is now supplied by KB Signaling.)59 The same software runs on freight and commuter units, and the vehicle type is set by a pin-out in the wiring harness.2 The UCII post covers the unit in detail: the dual-DSP receiver, the vital CPU with two diversely encoded channels, and the keyed vital output that holds the brakes released only while it is continuously refreshed.

For PTC, the behavior that matters is enforcement.2

  • The overspeed warning comes before the overspeed protection point, set 2 mph above the speed limit. Above it, the UCII makes "an irrevocable Penalty Brake Application by de-energizing the Electro Magnetic Valve." Where the warning starts varies: Capital Metro's DMUs warned 1 mph below the limit until a 2025 amendment moved the warning to 1 mph above, because the alarm sounded "even when the engineer is operating at the allowed speed." FRA approved it on condition that Capital Metro report its overspeed penalties every quarter through October 2026.912
  • On a code drop, the onboard computes how long the train may keep its current speed before it must brake, the time to penalty. In 2013 the alarm sounded below 8 seconds; the 2016 amendment cut that to 4 seconds. The penalty applies at zero "or [when] no code is detected."213
  • No Code Proceed (NCP) lets a train move through a section with no code, at restricted speed. It "cannot be entered while the train is moving"; the alarm sounds at 10 mph, and a penalty applies at 12 mph. Every use is counted, and discrepancies on the counter must be investigated and reported to FRA. Those are the WES figures; Capital Metro, UTA and SMART enforce 15 mph in NCP.4510
  • Cut-out requires the dispatcher's authorization.

FRA was uneasy about NCP from the start. In 2013 it said it would accept the function "in the near term. However, in the long term (past 2015), the potential of a single-point failure related to the use of the NCP function will no longer be acceptable." The 2016 amended Type Approval moved that horizon to after December 31, 2018.213 UTA received a federal grant in 2017 for "design and testing of a two-step No-Code Proceed system,"14 and both UTA and SMART now require the dispatcher to release NCP by data radio, UTA by an amendment approved in July 2020 and SMART by one approved that December. FRA made SMART's radio release a condition of its certification, due by June 30, 2021. WES and Capital Metro took a different route: a dispatcher-applied Speed Restriction Override lets one train past a zero-speed restriction at restricted speed, and "NCP is no longer used, except in case of E-ATC system failure."615 No host removed NCP. It remains the way to move a train when the code itself has failed.

Certification

E-ATC's Type Approval, FRA-TA-2013-01, was issued on April 12, 2013, to Portland & Western Railroad, not to DCTA, and amended as FRA-TA-2013-01-A to approve timed code change points, the alarm threshold change, and operation through malfunctioning crossings.213 The Type Approval did not by itself approve vital use: "Use of E-ATC in vital applications by an individual railroad is not authorized unless and until E-ATC is certified by FRA for that specific railroad application."13

The first certification was hard. Portland & Western withdrew one safety plan revision in July 2018 "after completion of an FRA review that identified significant technical issues," and FRA's December 2018 conditional certification was "contingent on PNWR demonstrating" that its rate of hazardous events, then 1.89 × 10⁻⁹ per hour on the basis of 9.94 × 10⁸ operating hours, was at or below the 10⁻⁹ per hour vital threshold, with monthly reports.16 The same letter's comments raised the question covered in the UCII post: whether a single processor, however carefully designed, can meet the vital standard.17 FRA certified WES as a vital overlay on May 11, 2020, and thanked Portland & Western and TriMet as "instrumental in helping other railroads make progress."18 Denton County followed on December 10, 2020, with a plan revised "to align with the baseline E-ATC PTCSP." FRA used the same words for Capital Metro and SMART, which points to a shared safety case among the E-ATC railroads.192015

So E-ATC, alone of the five systems, was certified as a vital overlay without a separate positioning or communications layer to argue about. Its weak points, as the filings tell it, are in the onboard's single processor, in NCP, and, as Denton County's 2026 amendment shows, in the office link. DCTA's October 2026 amendment, still pending, replaces a dispatch system its vendor no longer supports with one that combines its CTC and E-ATC restriction requests in a single signal vital processor, and names the hazard it has to guard against: "If there was a mismatch in TSR request bits, a cab rate for a higher TSR speed than what the dispatcher intended could be transmitted."21

ITCS: GPS and radio on the Michigan line

History

The Incremental Train Control System has been in revenue service on Amtrak's Michigan Line since 2000. FRA's program page tells the story: "The program started in 1996 with a contract for Harmon Electronics, which has since been acquired by General Electric, to develop the first ITCS demonstration on this corridor," initially on 66 miles of Amtrak's Michigan line between Kalamazoo and New Buffalo "to allow 110-mph operation."22 FRA dates revenue service to September 2000 at 79 mph; Amtrak's own filing says the display came on in March 2000 and enforcement began on April 18, 2001, at first on 45 miles.23 The limit was raised to 90 mph in 2002, 95 mph in 2005, and 110 mph in February 2012.22

FRA issued Type Approval FRA-TA-2012-001 and System Certification together, in a letter of December 27, 2012, through Amtrak's request for expedited certification under 49 CFR 236.1031: "FRA finds that the ITCS described and built on the Amtrak line between Porter, Indiana, and Kalamazoo, Michigan, satisfies the requirements for Positive Train Control (PTC) systems."24 Amtrak asked in January 2019 to extend that certification east to CP Townline in Dearborn, MP 7.4.25 FRA's own PTC system page still says ITCS certification "is pending successful resolution of a few remaining issues," which predates the 2012 letter.26 FRA's program page, last updated June 2024, says "ITCS remains in place and active on this route today,"22 and in January 2025 FRA wrote that ITCS has run on the whole line, Porter to Dearborn, since December 2020.27

How it works

ITCS was designed by GE's signaling business "to serve as a vital overlay that provides automatic warning and enforcement of a positive train stop in conjunction with wayside stop signal indications of a Traffic Control System ... permanent and temporary speed restrictions; and, advanced highway-rail grade crossing warning system activation for train operations up to 110 mph."24

  • Onboard. "The OBC is an enhanced version of the GE UltraCab II, augmented with GPS, displays, and additional interfaces into the locomotive." It has two logical functions: train protection (communications, speed, display, vital braking) and location processing.24 It starts from the same Ultra Cab II as E-ATC's onboard, but adds GPS, a data radio and its own host and location processors.
  • Wayside. A wayside interface unit (WIU) at each signal, switch and crossing reads its status. Every five to seven miles, usually at a control point, a WIU-Server collects status from the WIUs in its region and talks to the trains. Each server has two GPS reference stations "surveyed for accuracy to within one foot," each correcting one half of the train's pair of GPS receivers. One reference station also provides the time base for the radio.24 The WIUs originally reported to the server by spread spectrum radio. Since the 2019 extension they use Amtrak fiber.25
  • Radio. TD220 radios on a TDMA network in the 220 MHz band. Amtrak replaced the original 900 MHz network in May 2009.23 (FRA's program page still describes it as a UHF network on ATCS Specification 200 frequencies.)22
  • Decisions on the train. "Host processors on board locomotives make most of the decisions," and FRA describes the office as needed mainly for temporary restrictions and health data.22 Since 2019 the dispatching system also sends work zone and failed crossing restrictions, and roadway workers can admit trains to a work zone from a handheld terminal.25

Compare that with I-ETMS in Part 1. Both locate the train by GPS and read the wayside by radio. But ITCS corrects GPS locally with surveyed reference stations at the wayside, and gets wayside status straight from the WIU-Server by radio, with no back office in the status path. It is a smaller, more local design, built for one corridor.

Crossings at 110 mph

The function that set ITCS apart is at grade crossings. A conventional crossing circuit starts the warning when a train enters an approach section sized for the line's speed. At 110 mph that approach would be very long. ITCS lets crossing warning systems "be pre-started to activate for trains operating at speeds above the capability of the conventional control circuitry start speeds," and reports crossing health continuously to approaching trains.24 The Type Approval makes it a hard limit: "Operation of ITCS at speeds above 79 miles per hour requires functioning highway-rail grade crossings with advanced activation coupled to the ITCS system."24 If a crossing fails to confirm, ITCS holds the train to the conventional start speed, 79 mph, and 15 mph over the crossing.28 Since 2025 FRA has required Amtrak's warning time tests to check recorded ITCS-started moves against the expected warning time.27

That is direct communication between trains and crossings, built because 110 mph running required it.

Limits

The 2012 certification is narrow. Maximum speed 110 mph. Software versions pinned. A short list of approved locomotives. FRA has since approved new onboard software in 2016, 2019 and 2021 and new wayside software in 2019, swapped the locomotive list for P42, P32-BWH, SC-44 and NS GP60 locomotives, and in 2025 added crossing warning time tests.2927 Track maintained to Class 6 for full speed.24 And two conditions that mark the limits of the design: Amtrak "must only allow exclusive track occupancy to protect roadway workers" unless it implements an employee-in-charge terminal, and "Neither this Type Approval nor System Certification authorizes the use of electronic delivery of authorities as the sole means."24 Amtrak has since added a handheld terminal for roadway workers in charge,25 but FRA's 2025 letter still holds Amtrak to the 2012 provisions.27

In 2021 FRA counted ITCS, like CBTC, as implemented by a single host railroad: Amtrak, "in parts of Michigan."1 Since December 2020 ITCS has covered the whole Michigan line from Porter to Dearborn.27 Amtrak runs I-ETMS off the line, and Caltrain's abandoned CBOSS system was partly built on ITCS (Part 1 covers that).30 East of Kalamazoo, on the 136 miles Michigan bought from Norfolk Southern, Amtrak installed two independent wayside systems: ITCS for passenger trains and I-ETMS so freight trains could run under their own system.3132

PATH: when CBTC is the PTC

A different starting point

The Port Authority Trans-Hudson is unusual among PTC railroads: an isolated system linking New Jersey and Manhattan, with no connection to the general railroad network, that is nevertheless a railroad under FRA's jurisdiction. When PATH resignaled, it did not add PTC to its old signals. It replaced the method of operation with Siemens' Trainguard MT communications-based train control.33

FRA issued Type Approval FRA-TA-2013-02 on April 12, 2013, the same day as E-ATC's, for a system designed "to serve as a vital stand-alone Positive Train Control (PTC) system."33

How it works

PATH's CBTC is a transit system first and a PTC system second.33

  • Control. When active, CBTC "replaces the existing traffic control method of operation by requesting an override of the wayside signal system to display a Flashing Green or Flashing Yellow ... signal aspect." The flashing aspect tells the crew CBTC is in control.
  • Functions. Automatic train operation with enforcement of movement authority, maximum speed, permanent and temporary restrictions, station berthing and door control, and positive stop at interlocking home signals and controlled wayside signals. "Moving virtual blocks" subdivide the physical track circuit blocks.
  • Wayside. Zone controllers vitally store and deliver movement authorities. Control center servers supervise. Every CBTC train needs an assigned "mission."
  • Location. Transponder pairs between the rails, read by both the head and rear CBTC units (which gives the train's length), with two independent optical pulse generators on the axles plus accelerometers for slip and slide.
  • Communications. An IP ring on single-mode fiber, and train-to-wayside radio in the "unlicensed 5.8 GHz band."
  • Fallback. The old wayside was replaced with microprocessor equipment acting as a Secondary Train Detection System. "The trip stops associated with the wayside signals will remain in service to provide redundant positive train separation for equipment not in a protected CBTC state." On a CBTC failure, trains fall back to the physical blocks.

The Type Approval sets a maximum of 59 mph, on PATH's PA-5 cars only, and notes that interoperability is "not addressed" because PATH "is an isolated rail system with no connection to the general rail system."33

Neither overlay nor stand-alone

PATH asked FRA to certify its system as stand-alone. FRA denied certification in January 2017, because PATH "had not submitted revenue service demonstration (RSD) test results," and listed 38 concerns.34 On November 27, 2018, it denied stand-alone status, this time on the merits, and conditionally certified the system as mixed instead. The reasoning is the cleanest illustration in the PTC record of how the four categories work:34

"PATH's CBTC system overrides the existing signal system, when active, and therefore cannot qualify as a vital overlay system under 49 CFR § 236.1015(e)(2). Furthermore, FRA has determined that, because PATH's CBTC system relies on its existing signal system to function as a Secondary Train Detection System (STDS), PATH's CBTC system cannot qualify as a stand-alone PTC system under 49 CFR § 236.1015(e)(3)."

An overlay sits on top of the method of operation and leaves it in charge. A stand-alone system replaces it. PATH's CBTC replaces the method of operation while it is working and depends on the old one when it is not. That is exactly what a well-designed CBTC system should do: fall back to fixed blocks and trip stops when the radio-based layer fails. PATH used the same fallback on purpose in 2025 and 2026, taking about 1.1 miles around a new interlocking out of CBTC while it was built, with CBTC guarding the boundary signals, the signal system protecting switches and portable trippers protecting work zones.35 It just does not fit either box. FRA's own system page still describes CBTC as stand-alone, reflecting the Type Approval rather than the certification.26

The same letter exempted PATH from the approach, time, route, indication and traffic locking requirements of 236.377 to 236.381 at interlockings controlled by Alstom iVPI vital processors, on condition that PATH visits each location yearly to verify the software version, that field-settable timers are unchanged, and that nothing has been modified outside its configuration management program.34

In service

PATH brought PTC into service on all lines in 2018, after a series of weekend shutdowns.36 In May 2022, two "safety incidents" were traced to "a software error," and PATH ran in manual mode and then in "manned automatic train control mode, with a procedural mitigation" until FRA approved the corrected software in September 2022.37 Software amendments have followed regularly since, covering the zone controllers, control center servers, carborne controllers, nine-car trains and a new interlocking at Westside.38

What the three show

Each of these systems answers the same question as I-ETMS and ACSES, and each answer follows from what was in the ground.

  • E-ATC had coded track circuits and a vital cab signal unit, so it used them as the PTC data channel. It is the most economical answer in the series, and the only one certified as a vital overlay without a separate positioning or radio layer. The cost is coarse speed steps, a dependence on the office link for restrictions, and the No Code Proceed problem.
  • ITCS had a 110 mph corridor with grade crossings, and in 1996 there was no PTC rule. It built a communication-based system before the rule existed, used GPS corrected at the wayside, and solved high-speed crossing activation along the way. Its approvals are narrow because it was built for one line.
  • PATH rebuilt its signaling anyway, so it got a modern CBTC system with PTC as one of its functions, and showed that FRA's categories assume a railroad either keeps its old method of operation or throws it away. A good CBTC design does neither.

The last part turns from systems to the connections between them: how railroads in 209 host and tenant relationships made their trains work on each other's PTC.

Notes

Footnotes

  1. Federal Railroad Administration, "Positive Train Control Systems," final rule, 86 FR 40154, 40155, July 27, 2021. federalregister.gov ↩ ↩2

  2. FRA Type Approval FRA-TA-2013-01, Enhanced Automatic Train Control, issued to Portland & Western Railroad, April 12, 2013, with schedule. railroads.dot.gov, archived ↩ ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11 ↩12 ↩13

  3. Denton County Transportation Authority, E-ATC PTC Safety Plan, Volume I, Revision 1.1, April 2, 2020, Executive Summary and sections 1.2 and 6.5.1. regulations.gov, FRA-2010-0074-0043 ↩ ↩2 ↩3

  4. Capital Metropolitan Transportation Authority, E-ATC PTC Safety Plan, Volume I, Revision 1.3, June 4, 2020, sections 6.2.4.4.2 to 6.2.4.4.4. regulations.gov, FRA-2010-0072-0070 ↩ ↩2 ↩3

  5. Utah Transit Authority, FrontRunner E-ATC PTC Safety Plan, Version 2.0, May 27, 2020, sections 6.2.3.2 and 6.2.4.4 (Bluebeam package; main body is an embedded file). regulations.gov, FRA-2010-0052-0049 ↩ ↩2 ↩3 ↩4 ↩5

  6. Portland & Western Railroad and TriMet, WES E-ATC PTC Safety Plan, Version 2.0, November 2019, sections 5.2, 6.2.3.1 and 6.2.4.4.6 (PDF portfolio; main body is an embedded file). regulations.gov, FRA-2010-0073-0068 ↩ ↩2 ↩3

  7. FRA letter to Utah Transit Authority approving its request for amendment to the PTC Safety Plan (Expedient Release of Mandatory Directives), June 20, 2023. regulations.gov, FRA-2010-0052-0061 ↩

  8. Portland & Western Railroad, Westside Express Service E-ATC PTC Safety Plan, Version 1.5, July 21, 2017, Volume I, section 6.2.4.4.2. regulations.gov, FRA-2010-0073-0047 ↩

  9. Capital Metropolitan Transportation Authority, Request for Amendment, PTC Safety Plan Revision 2, August 7, 2025, with KB Signaling release notes. regulations.gov, FRA-2010-0072-0081 ↩ ↩2 ↩3

  10. Sonoma-Marin Area Rail Transit, PTC Implementation Plan, Revision A09, October 2024, sections 3.5.4 to 3.5.6. regulations.gov, FRA-2014-0098-0054 ↩ ↩2

  11. The five E-ATC host railroads are identified from their dockets and filings: Portland & Western (FRA-2010-0073), DCTA (FRA-2010-0074), Capital Metro (FRA-2010-0072, Federal Register 2025-15789), UTA (Federal Register 2023-10462) and SMART (FRA-2014-0098). FRA's 2021 rule counts five E-ATC hosts without naming them. 2018 CRISI awards: railroads.dot.gov, archived ↩

  12. FRA letter to Capital Metropolitan Transportation Authority, conditional approval of its request for amendment to the PTC Safety Plan, September 19, 2025. regulations.gov, FRA-2010-0072-0084 ↩

  13. FRA letter to Portland & Western Railroad approving E-ATC PTCDP Revision 1.2, with amended Type Approval FRA-TA-2013-01-A, issued March 11, 2016. regulations.gov, FRA-2010-0073-0036; Type Approval: regulations.gov, FRA-2010-0073-0044 ↩ ↩2 ↩3 ↩4

  14. Federal Railroad Administration, FY2017 PTC grant selections, Federal Register 2017-24364. federalregister.gov ↩

  15. FRA letter to Sonoma-Marin Area Rail Transit, conditional certification of E-ATC as a vital overlay, December 4, 2020. regulations.gov, FRA-2014-0098-0042 ↩ ↩2

  16. FRA letter to Portland & Western Railroad, conditional certification of E-ATC as a vital overlay, December 28, 2018. regulations.gov, FRA-2010-0073-0063 ↩

  17. FRA, Enclosure 3 to the December 28, 2018 letter to Portland & Western Railroad (comment 16). regulations.gov, FRA-2010-0073-0063 ↩

  18. FRA letter to Portland & Western Railroad certifying E-ATC as a vital overlay, May 11, 2020. regulations.gov, FRA-2010-0073-0070 ↩

  19. FRA letter to Denton County Transportation Authority certifying E-ATC as a vital overlay, December 10, 2020. regulations.gov, FRA-2010-0074-0049 ↩

  20. FRA letter to Capital Metropolitan Transportation Authority certifying E-ATC as a vital overlay, August 10, 2020. regulations.gov, FRA-2010-0072-0071 ↩

  21. Denton County Transportation Authority, request for amendment, October 2026. regulations.gov, FRA-2010-0074-0053; notice: Federal Register 2026-21635 ↩

  22. Federal Railroad Administration, Incremental Train Control System program page, updated June 26, 2024. railroads.dot.gov, archived ↩ ↩2 ↩3 ↩4 ↩5

  23. Amtrak, Request for Expedited Certification and Type Approval, Incremental Train Control System, Revision 0.4, April 15, 2010, section 7.1. regulations.gov, FRA-2010-0029-0017 ↩ ↩2

  24. FRA Type Approval FRA-TA-2012-001 and System Certification for Amtrak's Incremental Train Control System, letter of December 27, 2012, with schedule. railroads.dot.gov, archived ↩ ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8

  25. Amtrak, Request for Amendment to Existing Expedited Certification (FRA-TA-2012-001) for ITCS Due to Territory Extension, January 25, 2019, section 4.1. regulations.gov, FRA-2010-0029-0115 ↩ ↩2 ↩3 ↩4

  26. Federal Railroad Administration, PTC System Information. railroads.dot.gov, archived ↩ ↩2

  27. FRA letter to Amtrak, January 31, 2025: "As of December 2020, Amtrak and its applicable tenant railroads have been operating an FRA-certified and interoperable PTC system, the ITCS, on Amtrak's Michigan Line East from Kalamazoo, MI to Dearborn, MI, and Amtrak's Michigan Line West from Porter, IN to Kalamazoo, MI." regulations.gov, FRA-2010-0029-0246 ↩ ↩2 ↩3 ↩4 ↩5

  28. Amtrak, PTC Implementation Plan, Revision 15.0, November 2025, section 1.6.2. regulations.gov, FRA-2010-0029-0291 ↩

  29. FRA approval of Amtrak's ITCS request for amendment, May 14, 2021, listing the current software and approved locomotives. regulations.gov, FRA-2010-0029-0156 ↩

  30. FRA Type Approval FRA-TA-2014-01, I-ITCS, September 26, 2014. regulations.gov, FRA-2010-0051-0036 ↩

  31. Amtrak testimony to the Senate Committee on Commerce, Science, and Transportation, October 3, 2018: I-ETMS installed "in parallel with either our Advanced Civil Speed Enforcement System (ACSES) or ITCS system," including "the eastern, Michigan-owned portion of the Michigan Line between Kalamazoo and Dearborn." commerce.senate.gov ↩

  32. Michigan Department of Transportation, PTC Implementation Plan, Revision 1.1, September 2016. regulations.gov, FRA-2010-0029-0077 ↩

  33. FRA Type Approval FRA-TA-2013-02, PATH CBTC, April 12, 2013, with schedule. regulations.gov, FRA-2010-0034-0029 ↩ ↩2 ↩3 ↩4

  34. FRA letter to the Port Authority Trans-Hudson, November 27, 2018. regulations.gov, FRA-2010-0034-0050 ↩ ↩2 ↩3

  35. FRA letter approving PATH's July 8, 2025 request for amendment, August 22, 2025. regulations.gov, FRA-2010-0034-0068 ↩

  36. "PATH gains FRA certification of PTC system," Mass Transit, December 2018. masstransitmag.com ↩

  37. Port Authority Trans-Hudson, "Port Authority Trans-Hudson's Request To Operate Its Positive Train Control System With Procedural Mitigations," Federal Register 2022-11633. federalregister.gov FRA approval of the fix, September 16, 2022: regulations.gov, FRA-2010-0034-0058 ↩

  38. PATH requests for amendment, Federal Register 2022-18574 (nine-car trains), 2025-03330, 2025-13460 and 2026-07455; FRA approval of the Westside interlocking, May 15, 2026. federalregister.gov, federalregister.gov, federalregister.gov, federalregister.gov, regulations.gov, FRA-2010-0034-0072 ↩

#ptc#e-atc#itcs#cbtc#cab-signals#ucii#series